- Measure R Bond Projects
Facilities, Maintenance & Operations
Measure R Bond Projects
-
On June 5th, 2018, the voters approved the Measure R Bond. The first issuance has been closed out with the completion of the approved construction projects. Many outstanding facility projects were completed within the first issuance. The east side of the gym was repaired and stuccoed, a kiln room was added, 450 square feet was added to the art room to create a STEAM room, site concrete was expanded around the kitchen area, pedestrian bridge improvements and DSA certification was achieved and a sports field with all weather synthetic track was completed.
The second issuance is underway with the completion of the replacement of the outdated fire alarm system in Loma Prieta. Also, the Kindergarten playground has been updated with a totally new play structure and an ADA-accessible soft play surface. During the summer of 2023, replacement of the heating system and addition of AC is expected to be completed, as well as two 40foot by 40foot shade structures. One will be located at Loma to serve the playground and the new track and field. The other will be placed next to the cheetah spot and will allow for outdoor educational sessions and lunch time shade while students eat. Other projects include new windows in both Loma Prieta and C.T. English, new floor coverings in Loma Prieta, south campus lower dirt lot and north campus dirt lot asphalt paving.
-
Expected Timeline for Major Events
Complete - East Gym Stucco
Complete - Kiln Room
Complete - STEAM Room
Complete - Pedestrian Bridge Certification
Complete - All Weather Track and Field
Complete - Out Dated Fire Alarm System
Complete - Kindergarten Playground
In Progress - New HVAC at Loma Prieta
In Progress - Two 40x40ft shade structures